Builders' Forum |
|
↓ Scroll to Last Comment ↓ | Forum Guidelines | Builders' Forum | ![]() |
�Good day all,
By twisted, i mean the floor is 1/2" higher in the starboard-aft section sitting on leve saw horses, from sheer to sheer or floor panal port to starboard shows 1/2 of a bubble off. Im not very concerned with that, as much as the best rout to install her skeg. Im guessing i need to vertically level it rather than square it to the floor. Thoughts, questions, comments.
No replies have been added to this post.