1. Kits & Plans
  2. Sailboats
  3. Autumn Leaves Canoe Yawl
Autumn Leaves Wooden Boat Kit
Autumn Leaves Canoe
standard-rigged Autumn Leaves canoe yawl under full sail.
Two Autumn Leaves canoe yawls sailing; one with lug rig and the other with standard rig
Autumn Leaves canoe yawl under sail with reefed lug rig
The Autumn Leaves Canoe Yawl, TERRAPIN, close-hauled under sail.
Autumn Leaves Wooden Boat Kit Thumbnail
Autumn Leaves Canoe Thumbnail
standard-rigged Autumn Leaves canoe yawl under full sail. Thumbnail
Two Autumn Leaves canoe yawls sailing; one with lug rig and the other with standard rig Thumbnail
Autumn Leaves canoe yawl under sail with reefed lug rig Thumbnail
The Autumn Leaves Canoe Yawl, TERRAPIN, close-hauled under sail. Thumbnail

Autumn Leaves Canoe Yawl

Builder Testimonials

A faithful evocation of the late 19th-century "Canoe Yawls" of England. A singlehander's dream, propelled by sail and oar.

  • Skill Level Advanced
  • Estimated Build Time 650 Hours

Build this boat if...

  • You are a fan of canoe yawls, particularly those historic designs but building one in the traditional manner is beyond your skill set
  • You want a boat with sailing capabilities to make an engine unnecessary
  • You appreciate the small-boat-cruising philosophy of L. Francis Herreshoff
  • Sophisticated Design

    Nothing else like it to buy or build

  • For Woodcrafters

    Boatbuilders, sharpen your block planes! 

  • Superior Support

    Tech support is free and unlimited

Build Your Kit Pay in full or choose a flexible payment plan with Learn More

We Can Help You Build This Boat

We offer classes for many of the boats we sell. For boats, such as this one, we can offer private classes upon request. Some customers also ask us to build the boat for them.

Specifications

Length
18' 5"
Beam
60"
Rowing Draft
8"
Sailing Draft
37"
Sail Area
187 sq. ft.
Hull Weight
1,500 lbs.
Max Payload
900 lbs.

Performance

Stability

4 out of 5
Very Tippy
Very Stable

Speed

3 out of 5
Cruiser
Racer

Payload

5 out of 5
Day Tripper
Freight Hauler

Ease of Construction

1 out of 5
Requires Patience
Very Easy
TERRAPIN is an Autumn Leaves Canoe Yawl built by David D.
TERRAPIN is an Autumn Leaves Canoe Yawl built by David D.

Overview

Pro-Kit   

The Humber Yawl Club was created in 1883 by canoe enthusiasts who wanted to cruise the rugged estuaries of Britain's east coast. The club oversaw the evolution of a uniquely elegant and capable class of pocket-cruising sailboats, led by legendary designers and club members such as George Holmes and Albert Strange. Few of these boats were canoes and most were not yawls, but the term "canoe yawl" became attached to these lovely designs.

Designer John C. Harris has been a lifelong admirer of the canoe yawl.  "To me, a 'canoe yawl' isn't just a design type; it's a self-contained small boat cruising philosophy.  According to this philosophy, skilled boatmen (and women) move their little boats along the coastline in all weather, artfully playing wind and tide to make passages without resorting to engines," he writes in his article about Autumn Leaves.

Read about the original design brief here.
Read a later sailing report here.

The attributes of a good canoe yawl include excellent sailing qualities on all points, the ability to make coastal passages in safety, snug but comfortable accommodations, and shoal draft. All of the best examples are engineless, instead relying on sailing efficiency and auxiliary oars to make the next anchorage. The chapter on ROZINANTE in L. Francis Herreshoff's book The Compleat Cruiser is probably the most persuasive case ever made for cruising in engineless boats like this.

The best-known canoe yawls, such as Albert Strange's WENDA, George Holmes's EEL, and Herreshoff's ROZINANTE, have something else in common besides a design philosophy: They are all really, really, really hard for amateurs to build, or impossibly expensive to have built professionally.

John Harris's hero Philip C. Bolger was attracted to the canoe yawl ethos and created a number of accessible modern designs, meant to be easier to build and/or more affordable. DOVEKIE, BIRDWATCHER, and ANHINGA are some examples. These are engineless double-enders, with modest accommodations, that can be propelled by sail or oar.

Harris has composed his own riff on the theme, Autumn Leaves. The editors of WoodenBoat magazine found the design interesting enough to publish an article in their March/April 2016 issue, generating quite a bit of interest in the concept.

Autumn Leaves is intended to be straightforward and cost-effective for amateur construction, capable of coastal cruising, and handy enough under sail that an engine is not missed. She measures 18'5" long, 60" wide, draws just 8" with the twin bilgeboards up, and weighs about 1500 lbs on the trailer.  She'll be easy to tow behind medium-sized cars. 

The 525 lbs. of lead beneath the floorboards of Autumn Leaves keeps the easily-driven hull upright and will help her carry momentum in tacking.  Even in very light air, this double-ender can coast from puff to puff in a way that will help keep the oars stowed. A thousand pounds worth of foam flotation beneath the cockpit, beneath the forward end of the berth, and outboard of the bilge board trunks more than offsets the lead ballast in the unlikely event of a swamping. 

Autumn Leaves Canoe Yawl

The cabin is small, as with all of the famous canoe yawls.  It's unusually ergonomic, however, and a vast improvement over Albert Strange's CHERUB II and that ilk.  There's a palatial single berth. The aft end of the berth flips up to create a luxurious "throne" for the singlehander.  All cooking, eating, and contemplation may be done from this plush chair.  Someone used to traveling light could make themselves at home for weeks at a time. The cabin could probably be rearranged to accommodate two adults, but the boat was designed primarily for singlehanders.

The small self-bailing cockpit is proportioned to allow the skipper to row the boat standing up and facing forward. 

Construction is a bit of a departure from Chesapeake Light Craft's preferred stitch-and-glue approach. No mold is required, but the plywood hull is reinforced by a series of stringers, rather than epoxy fillets and fiberglass cloth. This will speed assembly for most builders, and will save a lot of money in epoxy and fiberglass.  (A light sheathing of fiberglass is suggested for durability, but not required.)

Autumn Leaves Canoe Yawl

Builders undertaking Autumn Leaves should be comfortable reading traditional boat plans, and have  stationary tools such as a tablesaw and a bandsaw at their disposal. The neatly proportioned coach roof, hatches, and cockpit will require a bit of patient boat carpentry. Construction of a scale model would be a great way to get acquainted with the design.

Downloadable plans consist of 26 detailed pages, sized to be printed on 11" x 17" paper. Both balanced lug and jib-headed versions are included in the plans.

CNC-cut kits comprising all of the plywood parts are available for both of those versions. 

Buying Options

Choose Your Boatbuilding Experience

Start your kit-building experience by selecting the option that best fits your goals. Don’t have the confidence to build on your own? No worries! Join a boatbuilding class or hire us to build a custom boat for you.

  1. Select Your Configuration

    Build From a Kit:
    Most Pro Kits include, at minimum, the CNC-cut marine plywood parts. Many include epoxy, fiberglass, and timber as well.
    Build From Scratch:

    Source your own materials and hardware, and work from traditional plans.
    Order Study Plans or Assembly Guides:
    Like to study up a bit first? Where available, download study plans or a copy of the assembly guide.

  2. Choose Options and Add-Ons

    Additional Components:
    If this is a sailboat, you’ll need the Sailing Component Kit. Depending on the model, you can choose different sail colors, order a Line & Cordage Package, add nonskid decking, storage covers, and more. 

  3. Get Building!

    Computer-cut kits feature all of the latest tweaks to ease assembly, including slot-together frames, pre-drilled holes for stitching-and-gluing, puzzle joints, and precision in the fitting of parts.

Buy Now, Pay Later Pay in full or choose a flexible payment plan with Learn More

Standard Configuration

$5,225.00

This kit comprises every plywood part of Autumn Leaves, machi...

$2,299.00

Spar kit includes timber blanks made from cypress and spruce,...

$5,225.00

This kit comprises every plywood part of Autumn Leaves, machi...

$2,495.00

Spar kit includs timber blanks made from cypress and spruce, ...

$4,450.00

This timber package comprises the highest-quality cypress and...

$1,875.00

Enough MAS blush-free epoxy, hardener, and 6-ounce E-glass fo...

Alternative Configurations

$69.00

Builders undertaking Autumn Leaves should be comfortable read...

$59.00

Builders undertaking Autumn Leaves should be comfortable read...

Additional Options

$2,819.00

Lug Rig Main & Mizzen Sails, white Dacron (2 rows of reef...

$3,526.00

Lug Rig Main & Mizzen Sails (2 rows of reefs) Egyptian Cr...

$3,179.00

Sloop Rig Main, Mizzen, and Roller-Furling Jib, white Dacron ...

$4,018.00

Sloop Rig Main, Mizzen, and Roller-Furling Jib Egyptian Cream...

Videos

CLC Autumn Leaves Canoe Yawl

Ghosting Great Bay

Frequently Asked Questions

How do I order this kit?

Click on the Buying Options tab the top left of this page and follow the directions.

How much does this boat weigh and how much can it carry?

The weight and payload of this boat, along with other statistics such length and beam, can be found under Specs in the Specifications section, which is just below the lead image seen at the top of this page.

Can you send me the plans digitally?

Sorry, but until digital rights management technology for marine architectural work catches up to that used for books and music, we are unable to transmit digital plans. Currently, only study plans and manuals can be sent digitally.

Classes

We Can Help You Build This Boat

We offer classes for many of the boats we sell. For boats, such as this one, we can offer private classes upon request. Some customers also ask us to build the boat for them.

View Classes

Need Help Building it?

We’re here to help with any questions you might have during the build process.

Phone

Available Mon – Fri, 9am–5pm EST

410.267.0137

Email

We answer emails 7 days a week and within 24 hours

Contact Support

Chat

Available Mon – Fri, 9am–5pm EST

Start Chat